Work Title- R/F Pyararam to Gaddiralla Thanda

Created On: 2021-09-17
Approved On: 2018-09-04
Started On: 2018-09-04
Ended On: -

Work Title- R/F ZP Road to Govind Thanda (via) Mancha Thanda

Created On: 2021-09-17
Approved On: 2018-09-04
Started On: 2018-09-04
Ended On: -

Work Title- R/F Approach Road to Valu Thanda

Created On: 2021-09-17
Approved On: 2018-09-04
Started On: 2018-09-04
Ended On: -

Work Title- R/F Approach Road to Mylaram Kindi Thanda

Created On: 2021-09-17
Approved On: 2017-07-10
Started On: 2017-07-10
Ended On: -

Work Title- A/R. to Laxmi thanda

Created On: 2021-09-17
Approved On: 2014-12-30
Started On: 2014-12-30
Ended On: -

Work Title- Road from Bommalaramaram to Gattu Mysamma Temple

Created On: 2021-09-17
Approved On: 2014-12-30
Started On: 2014-12-30
Ended On: -

Work Title- Approach road to Pilligundla tanda

Created On: 2021-09-17
Approved On: 2014-12-30
Started On: 2014-12-30
Ended On: 2014-12-30

Work Title- Repairs to BT R/F R&B road to Pilligundla Thanda (v), Bommala Ramaram (M) 4 KM

Created On: 2021-09-17
Approved On: 2014-02-17
Started On: 2014-02-17
Ended On: -

Work Title- Laying of CC Road from Kushangula Satyanarayana (H) to MPDO Office at Bommala Ramaram Village (GEN)

Created On: 2021-09-17
Approved On: 2015-04-20
Started On: 2015-04-20
Ended On: -

Work Title- Jupalli Bixapathi (H) to Siddagoni Sreenu (H) and Bandi Satyanarayana (H) to Bejjanki Papi Reddy (H)

Created On: 2021-09-17
Approved On: 2020-03-14
Started On: 2020-03-14
Ended On: -

Work Title- Cosnst. Of 2 Rooms in IKP Building @ First Floor for IKP Training Center in Bommalaramaram

Created On: 2021-09-17
Approved On: 2020-06-26
Started On: 2020-06-26
Ended On: -

Work Title- Laying of CC Road from MukkeraSathyanarayana (H) to JupelliSathyanarayana (H) in BommalaRamaram HQ

Created On: 2021-09-17
Approved On: 2018-12-20
Started On: 2018-12-20
Ended On: -

Work Title- Special Repairs and Improvement work to PVC at Bommala Ramaram

Created On: 2021-09-17
Approved On: 2018-07-13
Started On: 2018-07-13
Ended On: -

Work Title- Const. of 10,000 LtrsSump in PHC Bommala Ramaram

Created On: 2021-09-17
Approved On: 2017-11-20
Started On: 2017-11-20
Ended On: -

Work Title- Providing of 04 LED Flud lights for Himast Poles near Bus Stop in GP Limits at B. Ramaram Village

Created On: 2021-09-17
Approved On: 2018-03-09
Started On: 2018-03-09
Ended On: -

Work Title- Laying of cC Road from Ayyagalla Srinu (H) to Islavath Jaama (H) in Boinipally Village(GEN)

Created On: 2021-09-17
Approved On: 2017-11-29
Started On: 2017-11-29
Ended On: -

Work Title- Laying of cC Road from Bhukya Rakkamma (H) to Vadthiya Balu (H) in Boinipally Village(GEN)

Created On: 2021-09-17
Approved On: 2017-11-29
Started On: 2017-11-29
Ended On: -

Work Title- Laying of CC Road from Vankdoth Pooliya house to Vankdoth Ramulu house at Chandu thanda H/o Boinapally

Created On: 2021-09-17
Approved On: 2018-02-08
Started On: 2018-02-08
Ended On: -

Work Title- Construction of Crematorium at Boinpally Village

Created On: 2021-09-17
Approved On: 2019-06-30
Started On: 2019-06-30
Ended On: -

Work Title- Laying of CC road from Bhukya Balu (H) to Bhukya Narsimha (H) & Bhukya Shankar (H) to Bhukya Kafar (H) in Bukya Thanda H/o Laxmi thanda Village

Created On: 2021-09-17
Approved On: 2019-08-30
Started On: 2019-08-30
Ended On: -

Work Title- Construction of Rythuvedika at Malyala

Created On: 2021-09-17
Approved On: 2020-06-27
Started On: 2020-06-27
Ended On: -

Work Title- Laying of CC Road fromGangoji Laxmi kantham house to Mudi raj function hall and chadam Veeresham (H) to MPDO office

Created On: 2021-09-17
Approved On: 2018-03-21
Started On: 2018-03-21
Ended On: -

Work Title- Balance work of SC Community Hall

Created On: 2021-09-17
Approved On: 2015-06-24
Started On: 2021-12-24
Ended On: -

Work Title- Das house to Grrala Appa Reddy House

Created On: 2021-09-17
Approved On: -
Started On: -
Ended On: -

Work Title- Construction of GP Building (Shambunipuram)

Created On: 2021-09-15
Approved On: 2017-02-01
Started On: 2017-02-01
Ended On: -

F1/102/GP/MGNREGS/DRDA/2016, Dt.    .02.17

Work Title- Construction of Rythuvedika (Sharajipet)

Created On: 2021-09-15
Approved On: 2020-06-27
Started On: 2020-06-27
Ended On: -

S3/ 113/MGNREGS/ Rythu Vedika/YDD/2020 & 27-JUN-20

Work Title- Construction of Crematorium (Sharajipeta)

Created On: 2021-09-15
Approved On: 2019-12-30
Started On: 2019-12-30
Ended On: -

F1/102/MGNREGS/CREMATORIA/DRDA/2019 & 30-DEC-19

Work Title- CC Road from Doodala Laxmi Narayana (H) to Shivalayam, Mallapuram Ram Narsaiah (H) to Puttala Yadagiri (H)

Created On: 2021-09-15
Approved On: 2020-02-22
Started On: 2020-02-22
Ended On: -

22.02.2020/ 07.03.2020

Work Title- Laying of CC Road from Donga Chandra Reddy (H) to Panthulu Satyanarayan (H)

Created On: 2021-09-15
Approved On: 2020-03-14
Started On: 2020-03-14
Ended On: -

Work Title- Laying of CC Road from Yerra Mallaiah (H) to Kanthi Ilaiah (H) in Sharajipeta village

Created On: 2021-09-15
Approved On: 2018-02-08
Started On: 2018-02-08
Ended On: -

Work Title- CC Road Dudala Yadgiri to Kandraju Ram Narsaiah

Created On: 2021-09-15
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: -

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- CC Road Bathula Chandrakala (H) to Konda Krishna kanth Reddy (h)

Created On: 2021-09-15
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: -

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- Construction of GP Building (Sharajipet)

Created On: 2021-09-15
Approved On: 2011-04-07
Started On: 2011-04-07
Ended On: -

C3/5292/09-10/ZPP, Dt.:07.04.11

Work Title- Designer Painting and Minior Repairs to Anganwadi Building at Sharajipet

Created On: 2021-09-14
Approved On: 2017-10-17
Started On: 2017-10-17
Ended On: -

Proc. No. 703/CBF/Plg/2017-18, Dt.17.10.17

Work Title- Laying of CC Road from Morigadi Bixapathi (H) to Dudala Laxminarayana (H) at Sharajipet village

Created On: 2021-09-14
Approved On: 2017-06-28
Started On: 2017-06-28
Ended On: -

699/SDF/Alair/Plg/2016-17 Dt.28.06.17

Work Title- Construction of Compound Wall to Anganwadi Building at Sharajipet (15% W&CH)

Created On: 2021-09-14
Approved On: 2014-11-18
Started On: 2014-11-18
Ended On: -

C2/4391/2014/ZPP, Dt.18.11.2014

Work Title- Construction of Toilets, Providing of Drinking Water facility, Power Supply and painting of Anganwadi Builging at Sharajipet (15% W&CH)

Created On: 2021-09-14
Approved On: 2014-11-18
Started On: 2014-11-18
Ended On: -

C2/4391/2014/ZPP, Dt.18.11.2014

Work Title- Reconstruction and providing infrastructure at Vetarnary Dispansary at Sharajipet Village

Created On: 2021-09-14
Approved On: 2013-01-24
Started On: 2013-01-24
Ended On: 1970-01-01

GO Rt. No.38, Dt.24.01.2013

Brick Work Completed

Work Title- Special Repairts to R/f PWD road to Shaigudem

Created On: 2021-09-14
Approved On: -
Started On: -
Ended On: -

GO No 300

Work Title- B/W Construction of Community Hall at Saigudem Village

Created On: 2021-09-14
Approved On: 2016-06-08
Started On: 2016-06-08
Ended On: -

588/CDP/Alair-MLA/Plg-II/DMA/2015-16, Dt.08.06.16

Work Title- Construction of Community Hall at Raghavapuram Village

Created On: 2021-09-14
Approved On: 2017-10-12
Started On: 2017-10-12
Ended On: 1970-01-01

699/SDF/Alair/Plg/2016-17 Dt.12.10.17

Work Title- Construction of Crematorium (Raghavapur)

Created On: 2021-09-14
Approved On: 2019-12-30
Started On: 2019-12-30
Ended On: -

F1/102/MGNREGS/CREMATORIA/DRDA/2019 & 30-DEC-19

Work Title- Laying of CC Road from Aare Laxmi (H) to Saiyaboyina Sataiah (H) in Raghavapuram Village.

Created On: 2021-09-14
Approved On: 2018-03-21
Started On: 2018-03-21
Ended On: -

Work Title- Laying of CC Road from Sayaboina Siddulu (H) Sayaboina Sathaiah (H) in Raghavapuram Village

Created On: 2021-09-14
Approved On: 2018-02-08
Started On: 2018-02-08
Ended On: -

Work Title- Road from Gouda Narsimhulu (H) to Gouda Shivaraju (H)

Created On: 2021-09-14
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: -

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- Road from Uppali Anjaiah (H) to Erra Yakaiah (H)

Created On: 2021-09-14
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: -

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- Construction of GP Building (Raghavapur)

Created On: 2021-09-14
Approved On: 2010-08-04
Started On: 2010-08-04
Ended On: -

C3/2660/ZPP/10, Dt.04.08.10

Work Title- Construction of Gopalmitra's Service Centre at RAghavapur Village

Created On: 2021-09-14
Approved On: 2013-08-31
Started On: 2013-08-31
Ended On: -

GO Rt. No.377, Dt.31.08.13

Work Title- Laying of CC Road from Bandru Srishalam (H) to Mamidala Yadaiah (H) in Patelgudem Village.

Created On: 2021-09-14
Approved On: 2018-03-21
Started On: 2018-03-21
Ended On: -

Work Title- Laying of CC Road from Nidigonda Mahesh (H) to Bolla Yadaiah (H) at Patelgudem Village

Created On: 2021-09-14
Approved On: 2016-06-08
Started On: 2016-06-08
Ended On: -

731/CDP/Alair-MLA/Plg-II/2016-17, Dt.08.06.16

Work Title- Construction of Gopalmitra's Service Centre at Patelgudem Village

Created On: 2021-09-14
Approved On: 2013-08-31
Started On: 2013-08-31
Ended On: -

GO Rt. No.377, Dt.31.08.13

Work Title- Construction of Crematorium (Patelgudem)

Created On: 2021-09-14
Approved On: 2019-12-30
Started On: 2019-12-30
Ended On: -

F1/102/MGNREGS/CREMATORIA/DRDA/2019 & 30-DEC-19

Work Title- CC Road from Vaddla Sarojana (h) to Ch.Thirupathi (h) in Srinivaspuram H/o.Patelgudem

Created On: 2021-09-14
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: 1970-01-01

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- Road from Pwd Road To Matoor Via Kollur

Created On: 2021-09-14
Approved On: -
Started On: -
Ended On: -

GO Rt. No.20

Work Title- Laying of CC Road from Mylaram Lachaiah (H) to Hanuman Temple at Matoor village

Created On: 2021-09-14
Approved On: 2017-06-28
Started On: 2017-06-28
Ended On: -

699/SDF/Alair/Plg/2016-17 Dt.28.06.17

Work Title- B/W Constructin of PYYKA Building at Matoor Village (GEN)

Created On: 2021-09-14
Approved On: 2015-06-20
Started On: 2015-06-20
Ended On: 1970-01-01

550/CDP/Alair-MLA/Plg-II/DMA/2014-15, Dt.20.06.15

Work Title- Construction of Crematorium (Mantapuri)

Created On: 2021-09-14
Approved On: 2019-12-30
Started On: 2019-12-30
Ended On: -

F1/102/MGNREGS/CREMATORIA/DRDA/2019 & 30-DEC-19

Work Title- Laying of CC Road from M.Srinivas (H) to BT Road (Manthapuri ) in Manthapuri Village

Created On: 2021-09-14
Approved On: 2018-03-21
Started On: 2018-03-21
Ended On: -

Work Title- Laying of CC Road from Lode Mallaiah (H) to Makkala Ramulu (H) at Manthapuri Village

Created On: 2021-09-14
Approved On: 2016-06-08
Started On: 2016-06-08
Ended On: -

731/CDP/Alair-MLA/Plg-II/2016-17, Dt.08.06.16

Work Title- CC Road from Bandi Pedda Ramulu (H) to Boini Ramesh (H), Manda Shankar (H) to Annam Chinna Siddulu (H), Sunchu Ramulu (H) to Kotagiri Janardhan (H), Sunchu Laxmi (H) to Narmeta Venkatesh H), Kadakanchi Mallaiah (H)to Nomula Sreenu (H) & Kurakula Mallesh (

Created On: 2021-09-14
Approved On: 2020-02-22
Started On: 2020-02-22
Ended On: -

22.02.2020/ 07.03.2020

Work Title- CC Road from Varala Bhumaiah (H)to Ila Bixapathi (H)

Created On: 2021-09-14
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: -

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- Construction of GP Building (Mandanapally)

Created On: 2021-09-14
Approved On: 2018-07-19
Started On: 2018-07-19
Ended On: -

GO Rt. No.510, Dt.19.07.2018

Work Title- Supply and Fixing of LED Lights with accessories in Mandanapally Village

Created On: 2021-09-14
Approved On: 2018-12-20
Started On: 2018-12-20
Ended On: -

Proc. No.23/DMF (T)/ Yadadri/2016, Dt.20.12.2018

Work Title- Providing fencing to Smashanavatika at Mandanpally(V) of Alair(M)

Created On: 2021-09-14
Approved On: 2020-05-18
Started On: 2020-05-18
Ended On: -

Proc.No.453/CBF/Plg/2019-20, Dt.18.05.2020

Work Title- Laying of CC Road from P. Rajaiah (H) to Panga Yadagiri (H) SC Colony in Mandanapally Village (SC)

Created On: 2021-09-14
Approved On: 2017-11-29
Started On: 2017-11-29
Ended On: -

1219/CDP/MLA/ALR/Plg/2017-18, Dt.29.11.17

Work Title- B/W Construction of Pyaka Building at Madanapally Village

Created On: 2021-09-14
Approved On: 2017-09-01
Started On: 2017-09-01
Ended On: -

97/CDP/MLA-ALR/Plg/2016-17, Dt.01.09.17

Work Title- Completion of incomplete BC Community Hall at Mandanpally

Created On: 2021-09-14
Approved On: 2016-06-25
Started On: 2016-06-25
Ended On: -

345/MPLADS/Plg-I/BNG(LS)/2015-16, Dt.25.06.16

Work Title- Laying of CC Road from Kummari Bixapathi house to Katika Bazar at Kolanpaka village

Created On: 2021-09-14
Approved On: 2017-06-28
Started On: 2017-06-28
Ended On: 1970-01-01

699/SDF/Alair/Plg/2016-17 Dt.28.06.17

Work Title- Construction of Crematorium (Kollur)

Created On: 2021-09-14
Approved On: 2019-12-30
Started On: 2019-12-30
Ended On: -

F1/102/MGNREGS/CREMATORIA/DRDA/2019 & 30-DEC-19

Work Title- CC Road from Ambala Abbulu (H) to Boddu Nagaiah (H), Thota Shiva Kumar (H) to Beesu Mogulaiah (H), Nagaram Sailu (H) to Gyadapaka Yadagiri (H)

Created On: 2021-09-14
Approved On: 2020-02-22
Started On: 2020-02-22
Ended On: -

22.02.2020/ 07.03.2020

Work Title- Laying of CC Road Shivarathri Mallaiah (H) to Katkuri Papaiah (H) in Kollur Village

Created On: 2021-09-14
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: -

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- CC Road from Thendu Bixapathi (H) to Gajula Chandraiah (H)

Created On: 2021-09-14
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: -

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- CC Road from Shanigaram Kistamma (H) to Pichhimattala Raju (H)

Created On: 2021-09-14
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: -

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- Construction of GP Building (Kollur)

Created On: 2021-09-14
Approved On: 2017-02-01
Started On: 2017-02-01
Ended On: -

F1/102/GP/MGNREGS/DRDA/2016, Dt.    .02.17

Work Title- Laying of CC Road from Gyadapaka Danaiah house to Gyadapaka Eruvaiah house at Kollur village

Created On: 2021-09-14
Approved On: 2017-06-28
Started On: 2017-06-28
Ended On: -

699/SDF/Alair/Plg/2016-17 Dt.28.06.17

Work Title- Construction Compound Wall & Fixing of Gate to BC Community Hall at Kollur(V)

Created On: 2021-09-14
Approved On: 2018-09-05
Started On: 2018-09-05
Ended On: -

1098/CDP/MLA-ALR/Plg/2018-19, Dt.05.09.18

Work Title- Construction of BC Community Hall at Kollur(V)

Created On: 2021-09-14
Approved On: 2018-09-05
Started On: 2018-09-05
Ended On: -

1098/CDP/MLA-ALR/Plg/2018-19, Dt.05.09.18

Work Title- Construction of Community Hall in Kollur Village (GEN)

Created On: 2021-09-14
Approved On: 2017-11-29
Started On: 2017-11-29
Ended On: -

1219/CDP/MLA/ALR/Plg/2017-18, Dt.29.11.17

Work Title- Construction of Rythuvedika (Patelgudem)

Created On: 2021-09-14
Approved On: 2020-06-27
Started On: 2020-06-27
Ended On: -

S3/ 113/MGNREGS/ Rythu Vedika/YDD/2020 & 27-JUN-20

Work Title- Construction of Rythuvedika (Kolanupaka)

Created On: 2021-09-14
Approved On: 2020-06-27
Started On: 2020-06-27
Ended On: -

S3/ 113/MGNREGS/ Rythu Vedika/YDD/2020 & 27-JUN-20

Work Title- Laying of CC Road from Sontem Mallesh (H) to Bairam Nagar X Raod at Kolanpaka Village

Created On: 2021-09-14
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: -

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- Laying of CC Road from Neela Murali (H) to Godhuma Kunta Ramulu (H) at Kolanpaka Village

Created On: 2021-09-14
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: -

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- Laying of CC Road from Gnagula Mallesh (H) to A. Narsaiah (H) at Kolanpaka Village

Created On: 2021-09-14
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: -

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- Construction of BC Community Hall at Kolanpaka(V)

Created On: 2021-09-14
Approved On: 2018-09-05
Started On: 2018-09-05
Ended On: -

1098/CDP/MLA-ALR/Plg/2018-19, Dt.05.09.18

Work Title- Completion of Incomplete the Youth building at Kolanpaka(V)

Created On: 2021-09-14
Approved On: 2018-09-05
Started On: 2018-09-05
Ended On: -

1098/CDP/MLA-ALR/Plg/2018-19, Dt.05.09.18

Work Title- Completion of Incomplete the BC Community Hall at Kolanpaka (V)

Created On: 2021-09-14
Approved On: 2018-09-05
Started On: 2018-09-05
Ended On: -

1098/CDP/MLA-ALR/Plg/2018-19, Dt.05.09.18

Work Title- B/W Construction of Youth Building in Kolanpaka Village (GEN)

Created On: 2021-09-14
Approved On: 2017-11-29
Started On: 2017-11-29
Ended On: -

1219/CDP/MLA/ALR/Plg/2017-18, Dt.29.11.17

Work Title- B/W Construction of Community Hall in Kolanpaka Village (GEN)

Created On: 2021-09-14
Approved On: 2017-11-29
Started On: 2017-11-29
Ended On: -

1219/CDP/MLA/ALR/Plg/2017-18, Dt.29.11.17

Work Title- Construction of Community Hall at Gadhi Compound in Kolanpaka Village

Created On: 2021-09-14
Approved On: 2015-10-01
Started On: 2015-10-01
Ended On: -

520/CDP-MLA/Alair/2014-15, Dt.01.10.15

Work Title- Construction of Youth Building at Kolanpaka Village (GEN)

Created On: 2021-09-14
Approved On: 2015-06-20
Started On: 2015-06-20
Ended On: -

560/CDP-MLA/Alair/Plg-II/2014-15, Dt.20.06.15

Work Title- Construction of Crematorium (Kolanupaka)

Created On: 2021-09-14
Approved On: 2019-12-30
Started On: 2019-12-30
Ended On: 1970-01-01

F1/102/MGNREGS/CREMATORIA/DRDA/2019 & 30-DEC-19

Work Title- CC Road from Vadlakonda Somulu (H) to Gundla Somaiah (H) at Kolanpaka village

Created On: 2021-09-14
Approved On: 2017-06-28
Started On: 2017-06-28
Ended On: 1970-01-01

699/SDF/Alair/Plg/2016-17 Dt.28.06.17

Work Title- CC Road from Sampathi Nagaraju (H) to Panthalapally Sambashiva Raju (H), Vanarasi Narsaiah (H) to Pathi Sailu (H), Vanarasi Sailu (H) to Nune Narsimhulu (H), Pathi Maisaiah (H) to Pathi Narsaiah (H), Gavvala Bhumaiah (H) to Kurma Sangam

Created On: 2021-09-14
Approved On: 2020-02-22
Started On: 2020-02-22
Ended On: -

22.02.2020/ 07.03.2020

Work Title- Laying of CC Road from AnreddyRaji Reddy (H) to GujjaNarsimhulu (H) in 5&6th Ward at Kolanupaka Village.

Created On: 2021-09-14
Approved On: 2018-03-21
Started On: 2018-03-21
Ended On: -

Work Title- Laying of CC Road from Vetarinary Hospital (H) to Bandi Lachaiah in Kolanupakavillage.

Created On: 2021-09-14
Approved On: 2018-03-21
Started On: 2018-03-21
Ended On: -

Work Title- Laying of CC Road from Mudiraj Sangam (H) to Panadi in Kolanupakavillage.

Created On: 2021-09-14
Approved On: 2018-03-21
Started On: 2018-03-21
Ended On: -

Work Title- Laying of CC Road from Akula Soma Lingam (H) to Mudiraj Bhavan in Kolanupakavillage.

Created On: 2021-09-14
Approved On: 2018-03-21
Started On: 2018-03-21
Ended On: -

Work Title- Laying of CC Road from Akula Srinivas H) to Mudiraj Sangam in Kolanupaka village.

Created On: 2021-09-14
Approved On: 2018-02-08
Started On: 2018-02-08
Ended On: -

Work Title- Laying of CC Road from Kummarindla Balnarsaiah (H) to Main Road in SC Colony Kolanupaka village.

Created On: 2021-09-14
Approved On: 2018-02-08
Started On: 2018-02-08
Ended On: -

Work Title- CC Road from Voggu Srisailam (H) to Tatipamula Somaraju

Created On: 2021-09-14
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: -

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- CC Road from Bedila Narayana (H) to Matui Kistaiah

Created On: 2021-09-14
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: 2017-03-21

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- CC Road from Anumula Anjan Reddy (H) to Pochamma Temple

Created On: 2021-09-14
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: -

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- CC Road from Library - Someswara Temple

Created On: 2021-09-14
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: -

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- CC Road from R&B Road to Jangala Colony

Created On: 2021-09-14
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: -

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- CC Road from Takella Ravi house to B.C. Hostel

Created On: 2021-09-14
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: -

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- Construction of GP Building (Kolanupaka)

Created On: 2021-09-14
Approved On: 2016-01-04
Started On: 2016-01-04
Ended On: -

G.O.RT.No. 5, Dt.04.01.2016, PR&RD (PROGS.II) DEPT

Work Title- Special Repairs to SC(AH)at Kolanpaka Village

Created On: 2021-09-14
Approved On: 2019-06-13
Started On: 2019-06-13
Ended On: -

GO Rt. No. 66, Dt.13.06.19

Work Title- Laying of CC Road from Vadlakonda Somulu (H) to Gundla Somaiah (H) at Kolanpaka village

Created On: 2021-09-14
Approved On: 2017-06-28
Started On: 2017-06-28
Ended On: -

699/SDF/Alair/Plg/2016-17 Dt.28.06.17

Work Title- Construction of Crematorium (Kandigadda Thanda)

Created On: 2021-09-14
Approved On: 2019-12-30
Started On: 2019-12-30
Ended On: 1970-01-01

F1/102/MGNREGS/CREMATORIA/DRDA/2019 & 30-DEC-19

No Land

Work Title- Construction of GP Building (Ikkurthy)

Created On: 2021-09-14
Approved On: 2011-04-07
Started On: 2011-04-07
Ended On: -

C3/5292/09-10/ZPP, Dt.:07.04.11

Work Title- Balance work of SC Community Hall

Created On: 2021-09-14
Approved On: 2015-06-20
Started On: 2015-06-20
Ended On: -

525/MPLADS/Plg-I/BNG(LS)/2014-15, Dt.24.06.15

Work Title- Laying of CC Road from GP Building to Malkaram Chandramouli (H) in Ikkurthy Village (GEN)

Created On: 2021-09-14
Approved On: 2015-06-20
Started On: 2015-06-20
Ended On: -

588/CDP/Alair-MLA/Plg-II/DMA/2014-15, Dt.20.06.15

Work Title- Construction of Crematorium (Gundlagudem)

Created On: 2021-09-14
Approved On: 2019-12-30
Started On: 2019-12-30
Ended On: -

F1/102/MGNREGS/CREMATORIA/DRDA/2019 & 30-DEC-19

Roof Laid

Work Title- Road from Muddepaka Mallaiah (H) to Bairapaka Poul (H), Gyara Parshuramulu (H) to Inja Saroja (H), Kethavath Somla Naik (H) to Kethavath Pandu Naik (H), Mudavath Hari (H) to Kethavath Sreenu (H), Aleti Srinivas (H) to Bheemagani Bhaskar (H)

Created On: 2021-09-14
Approved On: 2020-02-22
Started On: 2020-02-22
Ended On: -

22.02.2020/ 07.03.2020

Work Title- CC Road from Primary School to Erasarpu Kistaiah (h)

Created On: 2021-09-14
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: -

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- Laying of CC Road from Rahim Naik (H) to Kethavath Ramji (H) at Shivalala Thanda H/o. Gundlagudem Village

Created On: 2021-09-14
Approved On: 2017-10-12
Started On: 2017-10-12
Ended On: -

699/SDF/Alair/Plg/2016-17 Dt.12.10.17

Work Title- Construction of Milk Collection Centre in Gundlagudem Village (GEN)

Created On: 2021-09-14
Approved On: 2017-11-29
Started On: 2017-11-29
Ended On: -

1219/CDP/MLA/ALR/Plg/2017-18, Dt.29.11.17

Work Title- Laying of CC Road from M. Jalender (H) to Gajjela Yella Reddy (H) in Gundalgudem Village (GEN)

Created On: 2021-09-14
Approved On: 2015-06-20
Started On: 2015-06-20
Ended On: -

588/CDP/Alair-MLA/Plg-II/DMA/2014-15, Dt.20.06.15

Work Title- Construction of Rythuvedika (Golankonda)

Created On: 2021-09-13
Approved On: 2020-06-27
Started On: 2020-06-27
Ended On: -

S3/ 113/MGNREGS/ Rythu Vedika/YDD/2020 & 27-JUN-20

Work Title- Construction of Crematorium (Golankonda)

Created On: 2021-09-13
Approved On: 2019-12-30
Started On: 2019-12-30
Ended On: -

F1/102/MGNREGS/CREMATORIA/DRDA/2019 & 30-DEC-19

Work Title- CC Road from Chityala Narsaiah (H) to Bhongir Narsaiah (H)

Created On: 2021-09-13
Approved On: 2020-02-22
Started On: 2020-02-22
Ended On: -

22.02.2020/ 07.03.2020

Work Title- Laying of CC Road from Katkuri Srinivas (H) to Laggala Sri Hari (H) in Golanukonda village

Created On: 2021-09-13
Approved On: 2018-03-21
Started On: 2018-03-21
Ended On: -

Work Title- Laying of CC Road from Bairoji Shravan Kumar (H) to Shivalayam (H) in Golanukonda village

Created On: 2021-09-13
Approved On: 2018-03-21
Started On: 2018-03-21
Ended On: -

Work Title- Laying of CC Road from K prabhakar (H) to Chityala Narsaiah (H) ; R.Balaiah (H) to K.Mallaiah (h) in Golanukonda village

Created On: 2021-09-13
Approved On: 2018-03-21
Started On: 2018-03-21
Ended On: -

Work Title- Laying of CC Road from B Narsaiah (H) to Maturi Laxmi (H) in Golanukonda village

Created On: 2021-09-13
Approved On: 2018-02-08
Started On: 2018-02-08
Ended On: -

Work Title- R&B Road to Induri Janadrhan Reddy (H)

Created On: 2021-09-13
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: -

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- CC Road from Egamamidi Uppamma (H) to Gilla Ramnaraiah(H)

Created On: 2021-09-13
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: -

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- CC Road Baki Samelu (H) to Matoori Narsaiah(H)

Created On: 2021-09-13
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: -

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- CC Road from Terupalli Surendhar reddy (H) to thanda Sayamma (H)

Created On: 2021-09-13
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: -

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- Construction of GP Building (Golankonda)

Created On: 2021-09-13
Approved On: 2016-01-04
Started On: 2016-01-04
Ended On: -

G.O.RT.No. 5, Dt.04.01.2016, PR&RD (PROGS.II) DEPT

Work Title- Supply and Fixing of LED Lights with accessories in Golanukonda Village

Created On: 2021-09-13
Approved On: 2018-12-20
Started On: 2018-12-20
Ended On: -

Proc. No.23/DMF (T)/ Yadadri/2016, Dt.20.12.2018

Work Title- Construction of BC Community Hall at Golankonda(V)

Created On: 2021-09-13
Approved On: 2018-09-05
Started On: 2018-09-05
Ended On: -

Work Title- Laying of CC Road from Gram Panchayat Building to P. Sidda Reddy (H) at Golanukonda Village

Created On: 2021-09-13
Approved On: 2016-06-08
Started On: 2016-06-08
Ended On: -

731/CDP/Alair-MLA/Plg-II/2016-17, Dt.08.06.16

Work Title- Providing of Street Lights

Created On: 2021-09-13
Approved On: 2017-09-06
Started On: 2017-09-06
Ended On: -

87/CDP/KRRJR-MLC/Plg/2016-17, Dt.09.06.17

Work Title- Construction of GP Building (Dilawarpur )

Created On: 2021-09-13
Approved On: 2017-02-01
Started On: 2017-02-01
Ended On: -

F1/102/GP/MGNREGS/DRDA/2016, Dt.    .02.17

Work Title- Laying of CC Road from Sri Hanuman Temple to Milk Collection Centre at Dilwarpur Village (GEN)

Created On: 2021-09-13
Approved On: 2015-06-20
Started On: 2015-06-20
Ended On: -

550/CDP/Alair-MLA/Plg-II/DMA/2014-15, Dt.20.06.15

Work Title- Laying of CC Road Infront of Temple at Bahadurpet Village

Created On: 2021-09-13
Approved On: 2017-09-01
Started On: 2017-09-01
Ended On: -

97/CDP/MLA-ALR/Plg/2016-17, Dt.01.09.17

Work Title- Construction of GP Building (Ammanabole )

Created On: 2021-09-13
Approved On: 2016-01-04
Started On: 2016-01-04
Ended On: -

G.O.RT.No. 5, Dt.04.01.2016, PR&RD (PROGS.II) DEPT

Work Title- Laying of CC Road at BC Colony of Bahadurpeta (V)

Created On: 2021-09-13
Approved On: 2018-09-05
Started On: 2018-09-05
Ended On: -

1098/CDP/MLA-ALR/Plg/2018-19, Dt.05.09.18

Work Title- Construction of Rythuvedika (Gundlagudem)

Created On: 2021-09-13
Approved On: 2020-06-27
Started On: 2020-06-27
Ended On: -

S3/ 113/MGNREGS/ Rythu Vedika/YDD/2020 & 27-JUN-20

Work Title- Balance work of BC Community Hall

Created On: 2021-09-13
Approved On: 2015-06-24
Started On: 2015-06-24
Ended On: -

525/MPLADS/Plg-I/BNG(LS)/2014-15, Dt.24.06.15

Work Title- Laying of CC Road from Penta Laxmi (H) to Bethi Balamani (H) in Bharath Nagar in Aler Town

Created On: 2021-09-13
Approved On: 2018-03-21
Started On: 2018-03-21
Ended On: -

Work Title- Laying of CC Road from Katakam Sathaiah (H) to Racharla Narshimulu (H) in Bharath Nagar in Aler Town

Created On: 2021-09-13
Approved On: 2018-03-21
Started On: 2018-03-21
Ended On: -

Work Title- Laying of CC Road from Jukanti Bakkaiah (Pashikanti Balaram) (H) to Ovusula Prabhakar (Alagandula Narshinga Rao) (H) in Pochmavada in Aler Town

Created On: 2021-09-13
Approved On: 2018-03-21
Started On: 2018-03-21
Ended On: -

Work Title- Laying of CC Road from Kamsani Hanmanthu (H) to Balaraju (H) in ward No : 12 in Aler Town

Created On: 2021-09-13
Approved On: 2018-03-21
Started On: 2018-03-21
Ended On: -

Work Title- Laying of CC Road from Tallapally Mariyamma (H) to Balaraju (H) in ward No : 12 in Aler Town

Created On: 2021-09-13
Approved On: 2018-03-21
Started On: 2018-03-21
Ended On: -

Work Title- Laying of CC Road from Shakilam Nagaiah (H) to Godala Srinivas (H) in ward No : 12 in Aler Town

Created On: 2021-09-13
Approved On: 2018-03-21
Started On: 2018-03-21
Ended On: -

Work Title- Laying of CC Road from Mothilal Naik (H) to Sudarshan (H) in Aler Town (Mutyala Sreenu (H) to Chamakura Malla Reddy (H) in Mytri Colony)

Created On: 2021-09-13
Approved On: 2018-03-21
Started On: 2018-03-21
Ended On: -

Work Title- Laying of CC Road from M.Ravi (H) to Morigadi Ramulu (H) in Chinthalabasthi in Aler Town

Created On: 2021-09-13
Approved On: 2018-03-21
Started On: 2018-03-21
Ended On: -

Work Title- Laying of CC Road from Mohammedh Naseeruddin (H) to Dudala PeddaYadagiri (H) in ward No : 5 in Aler Town

Created On: 2021-09-13
Approved On: 2018-03-21
Started On: 2018-03-21
Ended On: 1970-01-01

Work Title- Laying of CC Road from Kondula Narshinga Rao (Hotel ) to Kishan Mestri (H) in in Aler (v)

Created On: 2021-09-13
Approved On: 2018-02-08
Started On: 2018-02-08
Ended On: -

Work Title- Laying of CC Road from Madhava Reddy (H) to Ramanarsaiah Panthulu (H) in Adarsha Nagar in Aler (v)

Created On: 2021-09-13
Approved On: 2018-02-08
Started On: 2018-02-18
Ended On: -

Work Title- Laying of CC Road from Bandru Narsimha (H) to Samudrala Sreedhar (H) at Alair Village

Created On: 2021-09-13
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: -

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- Balance BT on Road from Kolanpaka to Dharmareddygudem (via) Bairamnagar

Created On: 2021-09-13
Approved On: 2017-11-07
Started On: 2017-11-07
Ended On: -

Work Title- Road from PWD Road to Kandigadda tanda

Created On: 2021-09-13
Approved On: 2014-12-30
Started On: 2014-12-30
Ended On: -

Work Title- Road from Matoor Vartoor road to Chakampally

Created On: 2021-09-13
Approved On: 2014-12-30
Started On: 2014-12-30
Ended On: -

Work Title- Road from PWD Road to Saigudem

Created On: 2021-09-13
Approved On: 2014-12-30
Started On: 2014-12-30
Ended On: -

Work Title- Road from Kolanpaka to Dharmareddygudem via Bairamngar

Created On: 2021-09-13
Approved On: 2014-12-30
Started On: 2014-12-30
Ended On: -

Work Title- Construction of New MPP Building at Alair Village & Mandal

Created On: 2021-09-13
Approved On: 2015-10-13
Started On: 2015-10-13
Ended On: -

Work Title- Laying of CC Road from Mustfa (H) to Yelagala Papaiah (H) via Veeravanti Gopala Krishna in Aler (v)

Created On: 2021-09-13
Approved On: 2018-03-24
Started On: 2018-03-24
Ended On: -

Work Title- Laying of CC Road from Parre Ashok (H) to Nomula Veera Swamy (H) in BC Colony of Alair Village

Created On: 2021-09-13
Approved On: 2018-02-08
Started On: 2018-02-08
Ended On: -

Work Title- Laying of CC Road from Bestha Krishna (H) to MD Janimiya (H) in Bharath Nagar of Alair Village

Created On: 2021-09-13
Approved On: 2018-02-08
Started On: 2018-02-08
Ended On: -

Work Title- Laying of CC Road from Dr.Nagendra Swamy (H) to Anjaiah Teacher (H) in in Aler (v)

Created On: 2021-09-13
Approved On: 2018-02-08
Started On: 2018-02-08
Ended On: -

Work Title- Laying of CC Road from Manga Siddulu (H) to Vadla Sathaiah (H) in ward No : 10 in Aler Town

Created On: 2021-09-13
Approved On: 2018-02-08
Started On: 2018-02-08
Ended On: -

Work Title- Laying of CC Road from Thambala Ramachandraiah (H) to Bondugula Panthulu (H), K. Mallesh (H) to Yelagandula Kumara Swamy (H) & Thota Rangaiah (H) to Kavali Rama Chandram (H) in Alair Village

Created On: 2021-09-13
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: -

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- Laying of CC Road from 1. Mallela Rajaiah (H) to Sandula Yashoda (H) in SC Colony, 2. Pasham Vazraiah (H) to Boggu Narsimha Reddy (H), 3. Goura Siddiraju (H) to MD. Musthafa (H), 4. Ithe Narsaiah (H) to Dr. Balan (H), 5. Nara Bhaskar (H) to Kandula Deepak

Created On: 2021-09-13
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: -

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- Laying of CC Road from B. Shiva Lingam (H) to M. Mallesham (H) at Alair Village

Created On: 2021-09-13
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: -

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- Laying of CC Road from Ch Eshwaraiah (H) to Vaddepally Pullaiah (H) at Alair Village

Created On: 2021-09-13
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: -

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- Laying of CC Road from PACS Building to Girija House at Alair Village

Created On: 2021-09-13
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: -

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- CC Road from Pantham Venkatesh (H) to Bomma Shivalingam (Ramasamudram road) ( Road Code : 2003009)

Created On: 2021-09-13
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: -

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- CC Road from Putta Satyanarayana (H) to Bethoju Papaiah (H)

Created On: 2021-09-13
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: -

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- CC Road from Pantham Kishtamma (H) to Morigadi Ramulu (H)

Created On: 2021-09-13
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: -

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- CC Road from Amara Anjaiah (H) to Botla Laxmi (H)

Created On: 2021-09-13
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: 2017-03-21

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- CC Road from Jula Siddaiah (H) to Ande Lalitha (H)

Created On: 2021-09-13
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: -

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- CC Road from Bingi Dasharatha (h) to Gadde Srinu

Created On: 2021-09-13
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: -

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- CC Road from Botla Narsaiah (h) to Kudikala Damodhar ( Raghunathpur Road)

Created On: 2021-09-13
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: -

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- CC Road from Mailaboina Venkatesh (H) Bingi Venkatesh (H)

Created On: 2021-09-13
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: -

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- CC Road from Co-op Socity to Pantham Venkatesh (Ramasamudram road) ( Road Code : 2003009)

Created On: 2021-09-13
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: -

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- CC Road from Gouda Siddaraju (h) to Rasamalla Parsharamulu (H)

Created On: 2021-09-13
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: -

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- CC Road from Botla Narsaiah Bavi to Ankam Sarojana (H)

Created On: 2021-09-13
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: -

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- CC Road fromBonaboina Lingaiah (H) to Katkam Srinu

Created On: 2021-09-13
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: -

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- CC Road fromAre Yadamma (H) to Co-op Bank (Ramasamudram road)

Created On: 2021-09-13
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: -

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- CC Road from Konda Kailasam (H) to Ganapuram Anil (H)

Created On: 2021-09-13
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: -

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- CC Road from Nanda Sathemma (H) to Korukoppula Sathaiah (H)

Created On: 2021-09-13
Approved On: 2017-03-21
Started On: 2017-03-21
Ended On: -

F1/217/MGNREGS/ CC ROADS/ATE/2017, Dt.21.03.2017

Work Title- Construction of Indoor Mini Stadium at Alair Village & Mandal

Created On: 2021-09-13
Approved On: 2015-01-08
Started On: 2015-01-08
Ended On: -

GO Rt. No. 458, Dt.01.08.2015

Work Title- Consruction of Office Building of Asst. Director of Agriculture (Regular) at Alair Village & Mandal

Created On: 2021-09-13
Approved On: 2015-03-30
Started On: 2015-03-30
Ended On: -

GO RT No.162, Dt.27.03.15 of A&C(Agri.II) Dept. Proc. No.B1/3565/2014, Dt.30.03.15 of JD(AH), Nalgonda

Work Title- Construction of Additional class rooms at ZPHS Alair

Created On: 2021-09-13
Approved On: 2018-12-20
Started On: 2018-12-20
Ended On: -

Proc. No.23/DMF (T)/ Yadadri/2016, Dt.20.12.2018

Work Title- Constructiuon of New Class Room at ZP High School, Alair

Created On: 2021-09-13
Approved On: 2018-12-20
Started On: 2018-12-20
Ended On: -

Proc. No.23/DMF (T)/ Yadadri/2016, Dt.20.12.2018

Work Title- Construction of Friends Youth Club in Aler Town

Created On: 2021-09-13
Approved On: 2018-12-20
Started On: 2018-12-20
Ended On: -

Proc. No.23/DMF (T)/ Yadadri/2016, Dt.20.12.2018

Work Title- Special Repairs and Improvement work to PVC at Alair

Created On: 2021-09-13
Approved On: -
Started On: -
Ended On: -

Roc. No.6424/KI/K1/2018-6, Dt.13.07.18

Work Title- Construction of Hall for Dialysis Center at CHC Alair Premises

Created On: 2021-09-13
Approved On: 2019-10-29
Started On: 2019-10-29
Ended On: -

Proc.No.453/CBF/Plg/2019-20, Dt.29.10.19

Work Title- Completion of Incomplete the Compound Wall & Arch to Burrial ground at Alair HQ

Created On: 2021-09-13
Approved On: 2018-09-05
Started On: 2018-09-05
Ended On: -

1098/CDP/MLA-ALR/Plg/2018-19, Dt.05.09.18

Work Title- Construction Of Compound Wall to AD Agriculture office in Alair HQ

Created On: 2021-09-13
Approved On: 2018-09-05
Started On: 2018-09-05
Ended On: -

1098/CDP/MLA-ALR/Plg/2018-19, Dt.05.09.18

Work Title- Completion of Incomplete Vikasa Mahila Mandali bhavan in Silk Nagar Of Alair (V)

Created On: 2021-09-13
Approved On: 2018-09-05
Started On: 2018-09-05
Ended On: 2018-09-05

1098/CDP/MLA-ALR/Plg/2018-19, Dt.05.09.18

Work Title- Construction of Compoudn Wal to Milk Collection Centre in Alair HQ(GEN)

Created On: 2021-09-13
Approved On: 2017-11-29
Started On: 2017-11-29
Ended On: -

1219/CDP/MLA/ALR/Plg/2017-18, Dt.29.11.17

Work Title- B/W Construction of Burrial Ground and Compound Wall to Burrial Ground at Alair Town

Created On: 2021-09-13
Approved On: 2017-01-09
Started On: 2017-01-09
Ended On: -

97/CDP/MLA-ALR/Plg/2016-17, Dt.01.09.17

Work Title- Construction of Compound Wall to Burial ground and Mini Water tank with open bath hall for gents & 2 bath rooms for ladies in Burial ground at Alair Village

Created On: 2021-09-13
Approved On: 2016-06-08
Started On: 2016-06-08
Ended On: -

588/CDP/Alair-MLA/Plg-II/DMA/2015-16, Dt.08.06.16

Work Title- Laying of CC Road from NH 202 to PACS Godown at Alair Village (GEN)

Created On: 2021-09-13
Approved On: 2015-06-20
Started On: 2015-06-20
Ended On: -

550/CDP/Alair-MLA/Plg-II/DMA/2014-15, Dt.20.06.15

Work Title- Laying of CC Road from Pashikanti Janardhan (H) to Katkam Srinivas (H) at Alair Village (GEN)

Created On: 2021-09-13
Approved On: 2015-04-20
Started On: 2015-04-20
Ended On: -

520/CDP-MLA/Alair/2014-15, Dt.20.04.15

Work Title- Construction of Community Hall beside Chinthakindi Vishwanandam (H) in Alair Town

Created On: 2021-09-13
Approved On: 2020-03-23
Started On: 2020-03-23
Ended On: -

538/CDP/AKR-MLC/Plg/2018-19, Dt.23.03.2020

Roof to be laid

Work Title- Maintenance of road from Alair R&B Road to Bairenkunta

Created On: 2021-09-13
Approved On: 2015-06-03
Started On: 2015-06-03
Ended On: -

C1/1485/2015/ZPP, Dt.03.06.2015

Work Title- Maintenance of Internal Road at BC Colony at Alair

Created On: 2021-09-13
Approved On: 2015-06-03
Started On: 2015-06-03
Ended On: -

C1/1485/2015/ZPP, Dt.03.06.2015

Work Title- Maintenance of road from Kanakadurga Temple to Kolanupala Road at Alair

Created On: 2021-09-13
Approved On: 2015-06-03
Started On: 2015-06-03
Ended On: -

C1/1485/2015/ZPP, Dt.03.06.2015

Work Title- Maintenance of Flooring of ZPHS Girls High School Building at Alair

Created On: 2021-09-12
Approved On: 2015-06-04
Started On: 2015-06-04
Ended On: -

C1/1679/2015/ZPP, Dt.04.06.15

Work Title- Laying of CC Road from Pochamma Temple (via) Podduturi Ramulu (H) to Boddu Bhaskar (H) in Alair Village (15% SC)

Created On: 2021-09-12
Approved On: 2015-06-01
Started On: 2015-06-01
Ended On: -

C2/1673/2015/ZPP, Dt.01.06.2015

Work Title- Construction of Compound Wall to Anganwadi Building at Alair (15% W&CH)

Created On: 2021-09-12
Approved On: 2014-11-18
Started On: 2014-11-18
Ended On: -

C2/4391/2014/ZPP, Dt.18.11.2014

Work Title- Construction of Toilets, Providing of Drinking Water facility, Power Supply and painting of Anganwadi Builging at Alair (15% W&CH)

Created On: 2021-09-12
Approved On: 2014-11-18
Started On: 2014-11-18
Ended On: -

C2/4391/2014/ZPP, Dt.18.11.2014

Work Title- Construction of Constituency Animal Disease Diagnostic Laboratory

Created On: 2021-09-12
Approved On: 2013-08-31
Started On: 2013-08-31
Ended On: 1970-01-01

GO Rt. No.377, Dt.31.08.13

Work Title- Construction of Rythuvedika

Created On: 2021-09-09
Approved On: 2018-12-12
Started On: 2018-12-12
Ended On: -

Work Title- Testing Design

Created On: 2021-09-08
Approved On: -
Started On: -
Ended On: -

Testing Design

Work Title- CC road from Hanuman temple to primary school

Created On: 2021-08-31
Approved On: 2016-08-06
Started On: 2016-08-06
Ended On: -

Admin Sanc : 560/CDP/Alair-MLA/Plg-II/2015-2016 Dt: 08.06.2016

Work Title- CC Raod from Singireddy house to primary school

Created On: 2021-08-31
Approved On: 1970-01-01
Started On: 1970-01-01
Ended On: 1970-01-01

Work Title- Construction of GP Building

Created On: 2021-08-30
Approved On: 2011-07-04
Started On: 2011-07-04
Ended On: -

C3/5292/09-10/ZPP

Work Title- Laying of CC Road from Hanuman Temple to Primary School at Bandakadipally Village

Created On: 2021-08-25
Approved On: 2016-08-06
Started On: 1970-01-01
Ended On: 1970-01-01

560/CDP/Alair-MLA

Work Title- Construction of Crematorium

Created On: 2021-08-25
Approved On: 1970-01-01
Started On: 1970-01-01
Ended On: 1970-01-01

Basement Level

Work Title- Laying of CC Roadfrom Megavath Bhuli (H) to Madothu Somla (H) & Megavath Mangtha (H) to Megavath Ballu (H)

Created On: 2021-08-25
Approved On: 2019-08-30
Started On: 1970-01-01
Ended On: 1970-01-01